REFERENCES

ESU constructed following Biogas Plants



UPPER AUSTRIA


Biogas plant BIBERAUER Construction type: Tube reactor
Constructed: 1991
Franz BIBERAUER Fermenter volume: 70 m3
Haslach 14 Gas yields: 200 m3 / day
4203 Altenberg Substrate: manure from milk cows, biowastes, fats & oils
Annual capacity: up to 1.000 tons


Biogas plant HOLZMANN Construction type: Tube reactor
Constructed: 1992
Leopold HOLZMANN Fermenter volume: 120 m3
4280 Königswiesen 67 Gas yields: 200 - 290 / day
Substrate: manure from chicken & cattle, fats & oils
Annual capacity: up to 1.700 tons


Biogas plant EDTHOFER Construction type: 2 Tube reactors
Constructed: 1992/93
Adolf EDTHOFER Fermenter volume: 200 m3
Aich 3 Gas yields: ca. 400 m3 / day
5143 Feldkirchen/Mattighofen Substrate: manure from fattened chicken, cattle, pigs, fats
Annual capacity: up to 2.700 tons


Biogas plant EICHMAIR Construction type: Tube reactor
Constructed: 1993
Johann EICHMAIR Fermenter volume: 60 m3
Scharedt 1 Gas yields: ca. 150 m3 / day
4901 Manning Substrate: manure from pigs und cattle, fats, biowastes
Annual capacity: up to 900 tons


Biogas plant AICHINGER Construction type: Tube reactor
Constructed: 1993
Franz AICHINGER Fermenter volume: 70 m3
Windham 8 Gas yields: ca. 200 m3 / day
4692 Niederthalheim Substrate: manure from pigs, fats, biowastes
Annual capacity: up to 1.000 tons


Biogas plant ECKER Construction type: Tube reactor
Constructed: 1994
Rudolf ECKER Fermenter volume: 100 m3
Oberaigen 13 Gas yields: ca. 300 m3 / day
4202 Hellmonsödt Substrate: manure from cattle, fats, biowastes
Annual capacity: up to 1.400 tons


LOWER AUSTRIA

Biogas plant BIOS 1 Construction type: 2 Tube reactors ā 150 m3
Constructed: 1995
Hubert SCHMIED Fermenter volume: 300 m3
Untergrafendorf Fermenter vol. af.: 1.000 m3
3071 Böheimkirchen Gas yields: ca. 1500 m3 / day
Substrate: manure from approx. 800 pigs, fats & oils, biowastes
Annual capacity: up to 5.000 tons